Step 2: Insert divider mold into pressing mold. Then pouring the prepared colors into the pattern divider chambers as designs.
Step 3: The pattern divider to be removed and then the first coat will be covered with another two layers of dried mortars and humidified one as basement. This step requires special technique to guarantee same thickness for every tile.
Step 4: Put whole mold into hydraulic pressing machine for a while.
Step 5: The tiles to be removed from molds carefully by the craftsman, then tile is inspected carefully for desired quality by himself before leaving for next steps.
Step 6: After curing in clean open air areas, tiles will be cured in water tanks for hardenning.
Step 7: The tiles will be cleaned and taken out to cooling rooms and put on drying racks for 3-4 days for being dried enough (less than 17% humidity) before waxing and packing in carton boxes for packing and loading. A serious quality control on every piece will be conducted in this step.